Custom Home Community Animal Rescue Effort's new Shelter and Adoption center at 4927 Main in Skokie

email a friend Email a Friend»

The fire sprinkler system piping is being installed at C.A.R.E. »

February 13, 2018

We have finished framing the walls and doors at Community Animal Rescue Effort in Skokie »

February 8, 2018

The catio’s have also been framed.

We have started the heating and A/C duct work at C.A.R.E. in Skokie. »

January 31, 2018

The dog kennels have been built at our commercial animal shelter build out. »

January 25, 2018

We have built the walls for the dog kennels for the Adoption Center at C.A.R.E. in Skokie.

The concrete has been poured over the underground plumbing at C.A.R.E. in Skokie »

January 9, 2018

The concrete has been patched after the underground plumbing work had been done.

The underground plumbing work as begun at Community Animal Rescue Effort’s in Skokie »

January 5, 2018

The underground plumbing for the sinks and trench drains around the dog kennels has been started.

New Glass block windows have been installed at the Community Animal Rescue Effort in Skokie »

December 22, 2017

New Dog Exercise Area and garbage enclosure fencing at C.A.R.E. in Skokie »

December 8, 2017

The parking lot is done at our commercial job in Skokie »

November 15, 2017

The parking lot has been paved and the parking lot strips have been painted.  Now we w need to wait at least 7 days before driving on the new asphalt.

We are paving the parking lot at C.A.R.E. in Skokie »

November 15, 2017

The concrete work has been completed at Community Animal Rescue Efforts, Inc. in Skokie! »

October 6, 2017

The curbs have been framed at our commercial job in Skokie »

October 5, 2017

We are removing the existing parking lot at C.A.R.E in Skokie! »

October 4, 2017

The water service is done and setup inside the C.A.R.E. building. »

October 3, 2017

The new water service is inside the building and we are back filling where we ran the new water lines from the street to the building with stone.

Bringing the new water line from the main in the street to the building at 4927 Main St. Skokie »

October 2, 2017

The concrete vault has been installed to protect the valve at the water main in the street, we have brought the water line to the building and are digging inside the building to install the new water line.

 

Water and Storm work continues at our commercial project in Skokie »

September 30, 2017

We have tapped into the main water line across the street and are bringing the new water line to the building.

 

We have started framing the walls at C.A.R.E. »

September 29, 2017

Demolition has been completed and we have started to frame new walls.

Civil work has begun at Community Animal Rescue Efforts, Inc. in Skokie »

September 27, 2017

We have started the storm work to replace two existing sinking storm basins in the parking lot.

We have tuck pointed our Commercial project in Skokie »

September 25, 2017

 

Tuck pointing and power washing of the original building makes the building look brand new again.


We have started interior demolition for C.A.R.E. Animal Rescue in Skokie. »

September 21, 2017

We have started to demolish the walls to create the wellness area, real life room and the cat feeding and laudry area.

We will be starting a commercial build out of an animal rescue facility in Skokie soon! »

July 25, 2017

We will be building out an animal rescue and adoption facility for Community Animal Rescue Effort (C.A.R.E.) at their soon to be new location at 4927 Main St. in Skokie.