Custom Home New Construction on Mango, Morton Grove

email a friend Email a Friend»

The Metal Window Well Grates have been installed at Mango in Morton Grove »

July 30, 2017

The Bathroom Tile Work has been Completed at our Custom Home in Morton Grove »

July 28, 2017

The exterior stonework has been completed at Mango in Morton Grove! »

July 14, 2017

We are tiling the bathrooms at our new construction in Morton Grove! »

July 11, 2017

Fireplace stone work complete at new construction in Morton Grove »

July 10, 2017

The front door installed at Mango in Morton Grove »

July 7, 2017

Starting the bathroom work on the Custom Home in Morton Grove. »

July 6, 2017

We have applied a waterproofing membrane in the showers and have installed the electric floor heat.

 

 

We are installing the hardwood flooring at Mango in Morton Grove. »

June 30, 2017

We are installing Brazilian cherry hardwood throughout the house.

 

The Stone Work on the Bays are done at Mango. »

June 24, 2017

We have installed the Valder’s stone and limestone on the bay areas on our Custom Home in Morton Grove.

 

We have started the Stone Work on the Front of our Custom Home in Morton Grove. »

June 17, 2017

Front Arched Window Installed at our New Construction in Morton Grove. »

June 2, 2017

The stone work on the garage is done on our custom home in Morton grove »

May 18, 2017

The Front Arch Window prior to installation »

June 2, 2017

The arched window has been put together and is now ready to install in the front.

The patio walls are being built at Mango in Morton Grove »

May 17, 2017

The garage slab and patio slab have been poured at Mango. »

May 13, 2017

We had to use a bobcat with a concrete carrier to bring the concrete to the back yard patio and garage.

We are hanging the drywall at our Custom Home in Morton Grove »

May 11, 2017

We are prepping the patio and garage slab at our new construction in Morton Grove! »

May 10, 2017

The gravel has been compacted and the wire mesh has been laid down and we can now pour the concrete.

Exterior Fireplaces at Mango in Morton Grove »

April 26, 2017

We have completed the stone work, poured the concrete chimney caps and installed the chimney pots on our Custom Home project in Morton Grove.

We have insulated at Mango in Morton Grove! »

April 24, 2017

We have sprayed the closed cell insulation at our new construction in Morton Grove.

The stone work continues on our new construction in Morton Grove! »

April 13, 2017

We are installing the limestone around the windows, the chimneys and the stone on the back side of the house.  We are using buff colored Valders Stone from Eden Stone in Wisconsin.

Our new construction in Morton Grove is ready for the rough inspections. »

March 4, 2017

The HVAC, Plumbing and Electrical work has been completed at Mango. »

March 3, 2017

We have started to install the stone on the garage in Morton Grove. »

February 28, 2017

Installing the freeze board, soffits and fascia on the garage in Morton Grove. »

February 28, 2017

The Valder Stone delivery from Eden Stone is being unloaded at Mango. »

February 24, 2017

Drying in the roof of our new construction in Morton Grove »

December 23, 2016

Drying in the roof means making it so that water falling on the roof does not penetrate and enter the house.  Since we are going to install Davinci synthetic slate on the roof, a special self adhering membrane underlayment is installed on the roof.

Installing the Pella Windows with the blinds in the glass at Mango »

December 16, 2016

Building the Oval Ceiling in the foyer to showcase the chandelier »

December 6, 2016

Building the roof at Mango in Morton Grove »

December 4, 2016

After the framing of the 2nd floor ceiling joists the roof rafters and plywood are installed.

Pouring the basement slab in Morton Grove »

November 29, 2016

We have installed the radiant tubing over the wire mesh in the basement and are now pouring the concrete for the slab.

Raising the second floor walls at Mango »

November 22, 2016

Building second floor walls at the new construction in Morton Grove. »

November 21, 2016

The second floor deck has been built in Morton Grove. »

November 18, 2016

The second floor deck is has been built at Mango in Morton Grove.

The basement slab is ready for radiant heat tubing to be installed at Mango »

November 15, 2016

The underground plumbing has been completed and inspected.  Then crushed gravel was spread evenly over the whole basement floor and the insulation/vapor barrier has been laid over the gravel and taped.  Then we installed a concrete reinforcement mesh on the top.  Now we are ready for the radiant heat tubing to be installed.

Building the first floor interior walls at new construction in Morton Grove »

November 14, 2016

We are raising the interior first floor walls at Mango.  The walls are built on the ground and then lifted into place and nailed.

Building the first floor walls in Morton Grove »

November 10, 2016

We are framing the first floor walls at the new construction at Mango.

 

Framing the first floor decking at Mango »

November 7, 2016

The framing has started and the framers are working on the first floor decking.  Once the first floor decking has been completed they can start to build the walls.

first-floor-decking-in-morton-groveframing-the-first-floor-decking-in-morton-groveframing-new-construction-mango

Installing Steel Beams and Columns in Morton Grove »

November 5, 2016

We are installing the steel beams and columns at Mango so that we can start framing the new construction.

crane-with-steel-at-new-constructioninstalling-steel-in-morton-groveinstalling-steel-at-mango

Waterpoofing the foundation at Mango in Morton Grove »

November 4, 2016

We are applying the Rub-R wall product to waterproof the foundation walls.  When the Rub-R wall product is used, the company warrants all the areas covered by the Rub-R wall product not to leak for the life of the foundation.   For more information about this product, you can go to http://www.westsiderubrwall.com/

spraying-rub-r-wall-on-foundationrub-r-wall-application-on-mangofoundation-waterproofing-morton-grove

Pouring the foundation walls at Mango in Morton Grove. »

November 3, 2016

We have installed horizontal and vertical rebar inside the form walls before we pour the concrete to make the walls stronger and are pouring 4000 PSI concrete.

rebar-foundation-mango-morton-grove-1pouring-foundation-mango-morton-grove-1foundation-walls-mango-morton-grove-1

Building the foundation walls before pouring the concrete at Mango in Morton Grove »

November 1, 2016

The forms were lowered into the basement and now they are being installed so that the concrete foundation walls can be poured.

mango-morton-grove-formsmango-morton-grove-framing-foundation-wallsmango-morton-grove-framed-and-ready-for-inspection

Installing the Drain Tile at Mango in Morton Grove »

October 29, 2016

Drain tile is a corrugated pipe with small slits covered with a fabric sleeve.  The drain tile is then covered with gravel.  The slits let water enter the pipe and the fabric sleeve prevents larger soil objects to enter the pipe.  The purpose of the drain tile is to collect the water around the basement foundation and divert it to the sump pump pit and then it is pumped out of the house and away from the foundation.

mango-morton-grove-drain-tilemango-morton-grove-drain-tile-installationmango-morton-grove-gravel-and-drain-tile

We have framed and poured the footings at Mango in Morton Grove »

October 28, 2016

We had the inspection from the Village of Glenview on the footings prior to pouring the concrete and got the green light so we poured the concrete.  The next step will be to frame the foundation walls and schedule a pre-pour inspection.

mango-morton-grove-footingsmango-morton-grove-framing-the-footingsmango-morton-grove-pouring-the-concrete-footings

Excavation on Mango in Morton Grove »

October 12, 2016

Demolition has been completed and excavation has started on our new construction in Morton Grove.  During excavation, the banks need to be protected so they don’t collapse so plywood and steel is used to shore the banks.  The shoring is covered with heavy plastic to protect the banks from any erosion by heavy rains.
morton-grove-excavationmango-morton-grove-excavation-and-shoring

Demolition has begun on Mango in Morton Grove today! »

September 30, 2016

We have torn down the first house and will start start tearing down the second house this coming week.  It is amazing how a house can be demolished in about a day and it takes many months to build.

mango-morton-grove-demolition-2mango-morton-grove-demolitionmango-morton-grove-demolition-3

We will be starting demolition of two houses on Mango Ave. in Morton Grove »

August 9, 2016

We will be starting demolition of two houses that will become one new custom home in Morton Grove in the next couple of weeks.  More pictures to follow during the construction of the new house.

Mango Morton Grove Site for New Construction - side view Mango Morton Grove Site for New Construction