Closing up the old entrance and making a new entrance to the service corridor at Shalimar Plaza Addison »

October 11, 2018



The sidewalk in front of Shalimar Plaza is being framed and prepped so that we can pour concrete in Addison »

September 28, 2018



The rough plumbing is done for the Hollywood Trendz Hair Salon build out in Addison »

September 25, 2018



Underground plumbing work for the bathrooms and sanitary at our commercial build outs in Addison »

September 24, 2018



Underground plumbing work has started for the kitchen in Four Seasons Steak & Grill in Addison »

September 19, 2018

We are installing the grease trap in the kitchen



We are excavating for the parking lot in front of Shalimar Plaza »

September 12, 2018



We have started framing Alara Designer’s Boutique at Shalimar Plaza in Addison »

September 3, 2018



The curbs are being poured at Shalimar Plaza in Addison »

August 31, 2018



We have started framing Hollywood Trendz salon and the service corridor in Addison »

August 23, 2018



The curbs are being framed and prepared for concrete at Shalimar Plaza in Addison »

August 23, 2018



The underground plumbing has been inspected and we have poured the concrete for the salon build out »

August 22, 2018



The parking lot elevations have been marked and we are getting ready to excavate in Addison »

August 17, 2018



Running the sanitary lines from inside the building to the sanitary manholes at our Commerical project in Addison »

August 10, 2018



Installing the sanitary manholes at our commercial store build outs in Addison »

August 7, 2018



The sanitary manholes are being delivered for our commercial job in Addison »

August 6, 2018



Alara Designer’s Boutique under ground plumbing has been completed and is being prepped to pour the concrete in Addison »

June 25, 2018



The salon underground plumbing is being prepped before pouring the concrete at our commerical buildout in Addison »

June 21, 2018



We are bringing the water lines to our 8 storefronts in Addison »

June 15, 2018

We are bringing the water lines from the City main to each of the store fronts.



We are putting in a utility vault for the water tap at 260-274 W. North Ave in Addison »

June 6, 2018

A utility vault is an underground room providing access to the water line and valves that are connected to the City main line



The underground pvc has been laid for Hollywood Trendz Hair & Spa in Addison »

June 5, 2018

The PVC for the bathroom, pedicure chairs and laundry room are done



The underground plumbing work has started at Alara Designer’s Boutique in Addison »

May 22, 2018



We have started cutting the concrete for the underground plumbing at Hollywood Trendz Hair Salon in Addison »

May 22, 2018



Removing fireproofing from the bar joists and roof decking at commercial project »

March 26, 2018



Scraping the old fire spray at our commercial job in Addison »

March 20, 2018

The old fire spray is falling off the joists so we are removing it all and will spray new cementitious fireproofing.



We are backfilling the grade beam with gravel at our commercial job in Addison! »

March 6, 2018



The forms have been removed and the grade beam is starting to cure in Addison »

February 23, 2018



We are pouring the concrete for the grade beam at Shalimar Plaza in Addison »

February 22, 2018



The grade beam is ready for concrete at our commercial job in Addison! »

February 19, 2018

We have put up the concrete forms and have laid all of the rebar and are ready to have the concrete trucks line up tomorrow.



The grade beam footing has been poured in Addison »

February 14, 2018



The footings are being framed for the grade beam at our commercial job in Addison. »

February 13, 2018

The grade beam is a reinforced concrete beam that sits on the caissons to spread the load of the building.  This footing gives the grade beam something level to sit on.



We are installing caisson piers for added support at Shalimar Plaza in Addison. »

January 23, 2018

We had to drill 12 feet down in the ground, install a lot of rebar and then pour concrete to give the front of the building the necessary support.



We have installed the new flat roof on Shalimar Plaza in Addison. »

November 24, 2017

The existing roof was torn off and a new TPO flat roof was installed on the new strip mall.

 

 



Temporary Shoring is needed before we can go forward with excavation at Shalimar Plaza »

October 25, 2017

We have added temporary shoring at each end of the warehouse and are adding additional lateral support to the outside walls before we can excavate.



Demolition of the warehouse is done in Addison »

August 26, 2017



Starting Demolition on the warehouse on the commercial building in Addison »

August 18, 2017

The roof has been cut so that the demolition can begin to remove 1/2 of the existing warehouse to create 8 store fronts.

 

 



Adding Additional Steel Support to brace the roof in Addison »

August 17, 2017

We are adding additional steel supports to brace the wall and roof since we had to remove a column that was hidden in a wall that was demolished.



Interior demolition has started at the 8 storefront build outs in Addison! »

July 24, 2017

We have started to remove all the existing ceiling tiles, electrical conduits and HVAC duct work.



The Fire Sprinkler Service has been moved in Addison. »

July 18, 2017

We have moved the RPZ values and have made the new fire sprinkler water connections to the existing Shalimar banquet hall.



Move RPZ values from old sprinkler room to new sprinkler room at Shalimar Plaza »

July 14, 2017

We need to move the existing RPZ’s from the sprinkler room that will be demolished to the new sprinkler room location.



Moved Waterline for Existing Shalimar Banquet Hall »

June 19, 2017

We had to move the water line from the portion of the building that is being demolished to the new water/sprinkler room so that we can begin demolition.

 



Testing the Fire Sprinkler Water Service at Shalimar Plaza in Addison. »

June 16, 2017

Before we could turn on the new fire sprinkler service, we need to perform a water flush test and a chlorination test for the fire department.  The new fire sprinkler service is up and running.



Moving the fire sprinkler water service for the 8 store fronts in Addison. »

June 15, 2017

The existing fire sprinkler water service is in the portion of the building that we are demolishing.  We had to excavate and run a new water line to the new sprinkler room.

 



Announcing Shalimar Plaza – 8 Strip mall store fronts in Addison »

June 11, 2017

Construction to start soon!

 



We will be transforming the warehouse along North Ave into 8 store fronts in Addison. »

May 31, 2017

We will be cutting about 1/3 of the warehouse to make room for parking along North Ave.  We will have to move the Fire Protection water service from the section of the building that is going to be demolished.



Starting a new commercial project at Shalimar Banquets in Addision »

May 31, 2017