Framing the walls at our remodel at Longmeadow in Lincolnwood »

March 25, 2022



Demolition has begun at our interior remodel on Longmeadow in Lincolnwood »

March 18, 2022



New Project starting in Lincolnwood »

March 17, 2022



Building out the 3rd floor deck in Lincoln Park »

September 28, 2021



Fire Sprinkler system has been hydro tested at Wolfram in Chicago »

September 21, 2021



Rough electrical completed at Lincoln Park »

September 18, 2021



Rough HVAC is done at Wolfram in Chicago »

September 16, 2021



Rough plumbing finished at our custom home in Lincoln Park Chicago »

September 16, 2021



Building the 2nd floor deck outside master bedroom at Wolfram »

August 14, 2021



Building the interior walls in the 3rd floor at our custom home in Lincoln Park »

August 5, 2021



Installing the Glulam trusses for the barreled roof in Lincoln Park »

July 29, 2021



Connecting new sanitary from street to house at Wolfram in Chicago »

May 20, 2021



Installing the Pella windows at Wolfram in Lincoln Park »

May 19, 2021



Building the interior walls at our custom home in Lincoln Park »

May 14, 2021



Installing structural brick on the 2nd floor at our custom home in Lincoln Park »

April 28, 2021



Installing steel in the 2nd floor at Wolfram in Chicago »

April 22, 2021



Building 2nd floor walls at custom home in Lincoln Park »

April 20, 2021



Installing the Atlas structural brick for 1st floor wall at Wolfram in Chicago »

April 10, 2021



Building 1st floor walls and installing steel at our custom home in Chicago »

April 9, 2021



Installing the 1st floor trusses at our Lincoln Park custom home »

April 2, 2021



Poured foundation slab at Wolfram in Chicago »

March 29, 2021



Installing radiant heat in the basement at our custom house in Lincoln Park »

March 16, 2021



Foundation has been covered with gravel at Wolfram »

March 11, 2021



Garage slab is backfilled at Wolfram in Chicago »

March 9, 2021



Underground plumbing is completed at our custom house in Lincoln Park »

March 9, 2021



We are about to start a new project in Evanston »

February 14, 2021



Removing the steel shoring from our custom home in Lincoln Park »

February 4, 2021



Demolition has begun at Paulina in Chicago »

January 27, 2021



Foundation forms are removed and damp proofing is done at our custom home on Wolfram »

January 26, 2021



Framing the foundation walls at Wolfram in Lincoln Park »

January 20, 2021



Framing and pouring the footings in Lincoln Park »

January 18, 2021



Cross bracing needs to be installed as we excavate at Wolfram in Lincoln Park »

January 15, 2021



Complete interior remodel starting soon at 5214 N. Paulina in Chicago »

December 29, 2020



The old house has been demolished at our new construction on Wolfram »

December 22, 2020



Testing the soil before demolition at our Lincoln Park project »

November 30, 2020



Demolition to begin soon at Wolfram in Lincoln Park Chicago »

September 29, 2020



Deconstruction has begun on Francisco in Chicago »

September 22, 2020

 
Recyclean has started to take out the windows to be recycled/reused and the hardwood flooring.



Addition on Francisco in Chicago starting soon »

September 17, 2020



Custom Home in Glenview: Branch Rd., Glenview, IL »

January 4, 2020

New Construction, 6 Bedroom, 4.1 Bath.



Front Elevation

House Front

Garage Door

House Front Door Entrance

Front Door Entrance

Foyer Stairs View

Foyer View

Foyer Hallway View

Foyer Front Door view

Kitchen view from Mudroom

Kitchen Breakfast Room View

Kitchen view from Great Room

Kitchen view from Breakfast Area

Kitchen east wall

Kitchen Dining Room view

Kitchen view from four season room

Kitchen Breakfast Area

Kitchen Great Room view

Four Season Room

Four Season Room with Furniture

Staircase

Office

Great Room wide view

Great Room side view

Great Room Front View

Great Room

Great Room Kitchen view

Staircase Dining Room

Dining Room view from the Kitchen

Dining Room

Dining west wall

Master Bedroom First Floor

Master Bedroom

MasterBed

Master Bathroom

Master Bathroom Vanity

Master Bath

Master Bathroom wide view

Master Bathroom Shower

Foyer Stairs view

Second Floor Stairs

Second Floor Foyer view

Laundry Room Second Floor

Third Bedroom Second Floor

1_Third Bedroom Second Floor

Jack and Jill Double Vanity

1_4th Bedroom Second Floor

Basement Stairs

Basement view

Basement Toy Room

Basement Great Room

Basement Great Room Fireplace

Basement Great Room wide view

Basement Bar and Pool Table

Basement Pool Table Area

Basement Pool Table front view

Basement Pool Table

Basement view from Exercise Room

Basement Wet Bar

Basement Bar and Wet Bar Area

Basement Kitchen Bar Wine Cellar

Basement Bathroom

Home Theatre

Outdoor Kitchen

South Elevation Entrance

Backyard Path

Backyard

Backyard East Elevation


Garage Flooring Experts are epoxying the garage floors at our Custom House in Glenview »

December 27, 2019



The closets are being installed at our custom house at 511 North Branch in Glenview »

December 24, 2019



The fireplaces are done at our custom house in Glenview »

December 2, 2019



The kitchen back splash tile is being installed at 511 North Branch in Glenview »

November 6, 2019



Installing the quartz and mantle on the fireplace at 511 North Branch »

October 25, 2019



The light fixtures are being installed at our custom house in Glenview »

October 24, 2019



We are painting our custom home in Glenview »

October 11, 2019



The master bathroom and wet bar cabinetry is being installed at our spec house »

October 11, 2019



The grass is starting to fill in at 511 North Branch in Glenview »

September 30, 2019



The balusters have been installed at our spec house in Glenview »

September 18, 2019

 



The floors are being stained at our custom spec house in Glenview »

August 30, 2019



We are putting down the grass seed at our spec house in Glenview »

August 23, 2019



Kilbourn in Skokie – Completed Addition – Gallery »

August 20, 2019


Kilbourn in Skokie – Completed Addition – Gallery - Builders News 4462 View Completed Project Gallery


Installing the basement wet bar cabinets in Glenview »

August 16, 2019



Installing the kitchen cabinets at 511 North Branch in Glenview »

August 8, 2019



Rubber flooring has been installed in the exercise room at our spec house in Glenview »

August 5, 2019

 



The trim and doors have been delivered and finish carpentry will start in Glenview »

July 29, 2019



We have started to install the hardwood flooring at our spec house in Glenview »

July 22, 2019



The backyard planting is done at our spec house in Glenview »

July 21, 2019



The front yard planting has been done at 511 North Branch in Glenview »

July 20, 2019



The tile work has begun in the master bathroom at our spec house in Glenview »

July 16, 2019



The stairs have been installed at our custom home in Glenview »

July 8, 2019



We are using an luxury vinyl plank (LVT) in the basement over radiant heated floors in Glenview »

July 1, 2019



We have laid the asphalt on our driveway at our spec house »

June 28, 2019



There is a front side walk to the house and more trees at 511 North Branch »

June 22, 2019



The front stoop is done and we will work on the sidewalk next at our new construction in Glenview »

June 15, 2019



The driveway is being prepped for asphalt at North Branch in Glenview »

June 13, 2019



The landscaping and paver work has start on our new construction in Glenview »

June 10, 2019



We have added a pergola over the garage at 511 North Branch in Glenview »

May 23, 2019



The drywall is done and we are getting ready to prime at our spec house in Glenview »

May 22, 2019



The insulation should be completed in the next few days and next will be drywall at our new construction in Glenview. »

May 2, 2019