Custom HomeNew Construction on Mango, Morton Grove



email a friend Email a Friend»

Building the first floor interior walls at new construction in Morton Grove »

November 14, 2016

We are raising the interior first floor walls at Mango.  The walls are built on the ground and then lifted into place and nailed.



Building the first floor walls in Morton Grove »

November 10, 2016

We are framing the first floor walls at the new construction at Mango.

 



Framing the first floor decking at Mango »

November 7, 2016

The framing has started and the framers are working on the first floor decking.  Once the first floor decking has been completed they can start to build the walls.

first-floor-decking-in-morton-groveframing-the-first-floor-decking-in-morton-groveframing-new-construction-mango



Installing Steel Beams and Columns in Morton Grove »

November 5, 2016

We are installing the steel beams and columns at Mango so that we can start framing the new construction.

crane-with-steel-at-new-constructioninstalling-steel-in-morton-groveinstalling-steel-at-mango



Waterpoofing the foundation at Mango in Morton Grove »

November 4, 2016

We are applying the Rub-R wall product to waterproof the foundation walls.  When the Rub-R wall product is used, the company warrants all the areas covered by the Rub-R wall product not to leak for the life of the foundation.   For more information about this product, you can go to http://www.westsiderubrwall.com/

spraying-rub-r-wall-on-foundationrub-r-wall-application-on-mangofoundation-waterproofing-morton-grove



Pouring the foundation walls at Mango in Morton Grove. »

November 3, 2016

We have installed horizontal and vertical rebar inside the form walls before we pour the concrete to make the walls stronger and are pouring 4000 PSI concrete.

rebar-foundation-mango-morton-grove-1pouring-foundation-mango-morton-grove-1foundation-walls-mango-morton-grove-1



Building the foundation walls before pouring the concrete at Mango in Morton Grove »

November 1, 2016

The forms were lowered into the basement and now they are being installed so that the concrete foundation walls can be poured.

mango-morton-grove-formsmango-morton-grove-framing-foundation-wallsmango-morton-grove-framed-and-ready-for-inspection



Installing the Drain Tile at Mango in Morton Grove »

October 29, 2016

Drain tile is a corrugated pipe with small slits covered with a fabric sleeve.  The drain tile is then covered with gravel.  The slits let water enter the pipe and the fabric sleeve prevents larger soil objects to enter the pipe.  The purpose of the drain tile is to collect the water around the basement foundation and divert it to the sump pump pit and then it is pumped out of the house and away from the foundation.

mango-morton-grove-drain-tilemango-morton-grove-drain-tile-installationmango-morton-grove-gravel-and-drain-tile



We have framed and poured the footings at Mango in Morton Grove »

October 28, 2016

We had the inspection from the Village of Glenview on the footings prior to pouring the concrete and got the green light so we poured the concrete.  The next step will be to frame the foundation walls and schedule a pre-pour inspection.

mango-morton-grove-footingsmango-morton-grove-framing-the-footingsmango-morton-grove-pouring-the-concrete-footings



Excavation on Mango in Morton Grove »

October 12, 2016

Demolition has been completed and excavation has started on our new construction in Morton Grove.  During excavation, the banks need to be protected so they don’t collapse so plywood and steel is used to shore the banks.  The shoring is covered with heavy plastic to protect the banks from any erosion by heavy rains.
morton-grove-excavationmango-morton-grove-excavation-and-shoring



Demolition has begun on Mango in Morton Grove today! »

September 30, 2016

We have torn down the first house and will start start tearing down the second house this coming week.  It is amazing how a house can be demolished in about a day and it takes many months to build.

mango-morton-grove-demolition-2mango-morton-grove-demolitionmango-morton-grove-demolition-3



We will be starting demolition of two houses on Mango Ave. in Morton Grove »

August 9, 2016

We will be starting demolition of two houses that will become one new custom home in Morton Grove in the next couple of weeks.  More pictures to follow during the construction of the new house.

Mango Morton Grove Site for New Construction - side view Mango Morton Grove Site for New Construction