The basement slab is ready for radiant heat tubing to be installed at Mango

November 15, 2016

The underground plumbing has been completed and inspected.  Then crushed gravel was spread evenly over the whole basement floor and the insulation/vapor barrier has been laid over the gravel and taped.  Then we installed a concrete reinforcement mesh on the top.  Now we are ready for the radiant heat tubing to be installed.