Skip to main content
847.410.0620

Commercial & Residential General Contractor

Mango Ave., Morton Grove, IL


Custom HomeNew Construction on Mango, Morton Grove



email a friend Email a Friend»

New Construction Custom Home on Mango, Morton Grove, IL »

January 26, 2019

The new owners are moving into their beautiful new house in Morton Grove.



Front Elevations Road View link

Front Elevations link

Foyer, Stairs Ceiling Lights link

Foyer Ceiling, Chandelier link

Foyer Window Drapery link

Staircases link

Foyer, Stairs, Formal Living Room link

Foyer, Left Stairs link

Elevator, Foyer, Front Door link

Front Door view from Glass Elevator link

Foyer, Front Doors link

Foyer, Stairs, Dining Room, Elevator link

Foyer, Stairs, Dining Room link

Dining Room, Window Decoration Detail link

Dining Room link

Dining Room Table link

Dining Room Cabinets link

Stairs link

Formal Living Room Front View link

Formal Living Room link

Formal Living Room Window Decoration link

Kitchen link

Kitchen Stove, Backsplash link

Kitchen Window View link

Dining Area Kitchen link

Kitchen, Dining Area link

Family Room link

Stairs, Foyer View from the second floor link

Master Bedroom Suite link

Master Bathroom link

Bedroom Suite 1 link

Bedroom Suite 1, Window Decoration link

Bathroom Suite 1 link

Bedroom Suite 2 link

Bathroom Suite 2, Window Decoration link

Bathroom Suite 2 link

Bedroom Suite 3 link

Bedroom Suite 3, Light On link

Bathroom Suite 3 link

Bathroom Suite 3, Shower link

Basement Staircases link

Basement Glass Elevator link

Basement Stairs link

Basement Room link

Basement Kitchen link

Basement Kitchen Side View link

Basement Kitchen Island link

Basement Kitchen Backsplash link

Garage, Backyard link

Garage Entrance link


The furniture has been delivered and put in place at Mango in Morton Grove »

January 24, 2018



Shower glass is being installed at our custom home in Morton Grove »

January 14, 2018



Finishing the foyer chandelier and bringing it up with the electric lift at Mango in Morton Grove »

January 5, 2018



Appliances have been delivered and we have started to install them at Mango in Morton Grove »

December 30, 2017



The stair hand rails are being installed on the bridal staircase in Morton Grove »

December 21, 2017



Chandeliers being installed at our new construction in Morton Grove »

December 16, 2017



Installing light fixtures at Mango in Morton Grove »

November 3, 2017



Kitchen back splash tile work at our new construction at Mango in Morton Grove »

October 25, 2017



The glass elevator is being installed at our new construction in Morton Grove »

October 24, 2017



Painting has begun at Mango in Morton Grove »

October 21, 2017



The owners have selected Ledger stone for the fireplaces at Mango in Morton Grove »

October 19, 2017



Granite is being installed at our custom home in Morton Grove »

October 19, 2017



Floors and stairs have been sanded and finished at our new construction on Mango in Morton Grove »

September 15, 2017



Fountain running at night with the lights at Mango in Morton Grove »

September 13, 2017



The fountain is done and running at Mango in Morton Grove »

September 12, 2017



The fountain urns have been installed and the system is being tested in Morton Grove »

September 11, 2017



Building the columns on the side of the driveway at Mango in Morton Grove »

September 9, 2017



Doors are being installed along with the trim work at our new construction on Mango in Morton Grove »

September 8, 2017



Installed AquaBlox, pumps and filling with water for the fountain urns at Morton Grove »

September 8, 2017



Landscaping work has started at Mango in Morton Grove »

September 7, 2017



The fountain and landscape work has begun in the front yard of our new construction on Mango in Morton Grove »

September 7, 2017



The patio is done and we have started the pavers on the walkways at our custom home in Morton Grove »

September 7, 2017



Stamped concrete driveway is done at Mango in Morton Grove »

September 5, 2017



Pouring the carport stairs at the custom home in Morton Grove »

September 2, 2017



Both kitchens are completed at our new construction at Mango »

September 1, 2017



The staircase is being built at Mango in Morton Grove »

August 30, 2017

The curved bridal staircase is custom built out of cherry wood.



Snow melt system is being installed in the driveway at Mango in Morton Grove »

August 29, 2017

The tubing below the concrete is being installed.



Main floor kitchen cabinets are being installed at the custom home in Morton Grove »

August 19, 2017



Downspout are being installed at the new construction on Mango in Morton Grove »

August 19, 2017



Building the home theater seating platforms at Mango in Morton Grove »

August 17, 2017

We are building the platforms that will be covered with carpet for 3 rows of seating.



Paver work on the patio at Mango in Morton Grove »

August 10, 2017

The pavers are made from the same stone that is on the house.  It is called Valder’s Stone.



Redirecting the downspouts at the new construction in Morton Grove »

August 9, 2017

We are redirecting the water to the pop-up emitters in the yard so that the rain water will be way from the house.

 



Bathroom Cabinets are being installed at Mango in Morton Grove »

August 9, 2017

These are custom cabinets built by Specialty Woodworking Inc.  All of the cabinets in the house are custom.



The Valders pavers will be used for the walk ways and patio on the custom house in Morton Grove »

August 8, 2017



Tile work has started in the basement at our new construction in Morton Grove »

August 1, 2017



The Metal Window Well Grates have been installed at Mango in Morton Grove »

July 30, 2017



The Bathroom Tile Work has been Completed at our Custom Home in Morton Grove »

July 28, 2017



The exterior stonework has been completed at Mango in Morton Grove! »

July 14, 2017



We are tiling the bathrooms at our new construction in Morton Grove! »

July 11, 2017



Fireplace stone work complete at new construction in Morton Grove »

July 10, 2017



The front door installed at Mango in Morton Grove »

July 7, 2017



Starting the bathroom work on the Custom Home in Morton Grove. »

July 6, 2017

We have applied a waterproofing membrane in the showers and have installed the electric floor heat.

 

 



We are installing the hardwood flooring at Mango in Morton Grove. »

June 30, 2017

We are installing Brazilian cherry hardwood throughout the house.

 



The Stone Work on the Bays are done at Mango. »

June 24, 2017

We have installed the Valder’s stone and limestone on the bay areas on our Custom Home in Morton Grove.

 



We have started the Stone Work on the Front of our Custom Home in Morton Grove. »

June 17, 2017



Front Arched Window Installed at our New Construction in Morton Grove. »

June 2, 2017



The Front Arch Window prior to installation »

June 2, 2017

The arched window has been put together and is now ready to install in the front.



The stone work on the garage is done on our custom home in Morton grove »

May 18, 2017



The patio walls are being built at Mango in Morton Grove »

May 17, 2017



The garage slab and patio slab have been poured at Mango. »

May 13, 2017

We had to use a bobcat with a concrete carrier to bring the concrete to the back yard patio and garage.



We are hanging the drywall at our Custom Home in Morton Grove »

May 11, 2017



We are prepping the patio and garage slab at our new construction in Morton Grove! »

May 10, 2017

The gravel has been compacted and the wire mesh has been laid down and we can now pour the concrete.



Exterior Fireplaces at Mango in Morton Grove »

April 26, 2017

We have completed the stone work, poured the concrete chimney caps and installed the chimney pots on our Custom Home project in Morton Grove.



We have insulated at Mango in Morton Grove! »

April 24, 2017

We have sprayed the closed cell insulation at our new construction in Morton Grove.



The stone work continues on our new construction in Morton Grove! »

April 13, 2017

We are installing the limestone around the windows, the chimneys and the stone on the back side of the house.  We are using buff colored Valders Stone from Eden Stone in Wisconsin.



Our new construction in Morton Grove is ready for the rough inspections. »

March 4, 2017



The HVAC, Plumbing and Electrical work has been completed at Mango. »

March 3, 2017



Installing the freeze board, soffits and fascia on the garage in Morton Grove. »

February 28, 2017



We have started to install the stone on the garage in Morton Grove. »

February 28, 2017



The Valder Stone delivery from Eden Stone is being unloaded at Mango. »

February 24, 2017



Drying in the roof of our new construction in Morton Grove »

December 23, 2016

Drying in the roof means making it so that water falling on the roof does not penetrate and enter the house.  Since we are going to install Davinci synthetic slate on the roof, a special self adhering membrane underlayment is installed on the roof.



Installing the Pella Windows with the blinds in the glass at Mango »

December 16, 2016



Building the Oval Ceiling in the foyer to showcase the chandelier »

December 6, 2016



Building the roof at Mango in Morton Grove »

December 4, 2016

After the framing of the 2nd floor ceiling joists the roof rafters and plywood are installed.



Pouring the basement slab in Morton Grove »

November 29, 2016

We have installed the radiant tubing over the wire mesh in the basement and are now pouring the concrete for the slab.



Raising the second floor walls at Mango »

November 22, 2016



Building second floor walls at the new construction in Morton Grove. »

November 21, 2016



The second floor deck has been built in Morton Grove. »

November 18, 2016

The second floor deck is has been built at Mango in Morton Grove.



The basement slab is ready for radiant heat tubing to be installed at Mango »

November 15, 2016

The underground plumbing has been completed and inspected.  Then crushed gravel was spread evenly over the whole basement floor and the insulation/vapor barrier has been laid over the gravel and taped.  Then we installed a concrete reinforcement mesh on the top.  Now we are ready for the radiant heat tubing to be installed.











back



News Reviews FAQ Site Map Login