Custom HomeNew Spec Home - 511 N. Branch in Glenview


Another stunning new construction. A 4927 sq. ft. house with a cook’s dream kitchen, the latest technology, an elevator, radiant heat in the basement, a spectacular home theater room, 4 season room with radiant heat, a spacious patio with built-in grill, whole house generator, 5 bedrooms, 4-1/2 baths, exercise room, office, and library. Spectacular finishes.


email a friend Email a Friend»

Custom Home in Glenview: 511 N Branch Rd., Glenview, IL 60025 »

January 4, 2020

New Construction, 4 Bedroom, 4.1 Bath.



Front Elevation link

House Front link

Garage Door link

House Front Door Entrance link

Front Door Entrance link

Foyer Stairs View link

Foyer View link

Foyer Hallway View link

Foyer Front Door view link

Kitchen view from Mudroom link

Kitchen Breakfast Room View link

Kitchen view from Great Room link

Kitchen view from Breakfast Area link

Kitchen east wall link

Kitchen Dining Room view link

Kitchen view from four season room link

Kitchen Breakfast Area link

Kitchen Great Room view link

Butlers Pantry link

Four Season Room link

Foyer Office View link

Staircase link

Powder Room link

Office link

Great Room wide view link

Great Room side view link

Great Room Front View link

Great Room Fireplace View link

Great Room link

Great Room Kitchen view link

Staircase Dining Room link

Dining Room view from the Kitchen link

Dining Room link

Dining west wall link

Master Bedroom First Floor link

Master Bedroom link

MasterBed link

EnSuite Bedroom Second Floor Sitting Area link

1_EnSuite Bedroom Second Floor Sitting Area link

Master Bathroom link

Master Bathroom Vanity link

Master Bath link

Master Bathroom Tub link

Master Bathroom Tub east wall link

Master Bathroom wide view link

Master Bathroom Shower link

Master Bathroom Shower closeup link

Foyer Stairs view link

Second Floor Stairs link

Second Floor Loft link

Second Floor Foyer link

Second Floor Foyer view link

Laundry Room Second Floor link

EnSuite Entrance Second Floor link

Third Bedroom Second Floor link

1_Third Bedroom Second Floor link

Jack and Jill Bath link

Jack and Jill Double Vanity link

4th Bedroom Second Floor link

1_4th Bedroom Second Floor link

Basement Stairs link

Basement view link

Basement Toy Room link

Basement Great Room link

Basement Great Room Fireplace link

Basement Great Room wide view link

Basement Bar and Pool Table link

Basement Pool Table Area link

Basement Pool Table front view link

Basement Pool Table link

Basement view from Exercise Room link

Basement Wet Bar link

Basement Bar and Wet Bar Area link

Basement Kitchen Bar Wine Cellar link

Basement Bathroom link

South Elevation Entrance link

Backyard Path link

Backyard link

Backyard East Elevation link


Garage Flooring Experts are epoxying the garage floors at our Custom House in Glenview »

December 27, 2019



The closets are being installed at our custom house at 511 North Branch in Glenview »

December 24, 2019



The fireplaces are done at our custom house in Glenview »

December 2, 2019



The kitchen back splash tile is being installed at 511 North Branch in Glenview »

November 6, 2019



Installing the quartz and mantle on the fireplace at 511 North Branch »

October 25, 2019



The light fixtures are being installed at our custom house in Glenview »

October 24, 2019



We are painting our custom home in Glenview »

October 11, 2019



The master bathroom and wet bar cabinetry is being installed at our spec house »

October 11, 2019



The grass is starting to fill in at 511 North Branch in Glenview »

September 30, 2019



The balusters have been installed at our spec house in Glenview »

September 18, 2019

 



The floors are being stained at our custom spec house in Glenview »

August 30, 2019



We are putting down the grass seed at our spec house in Glenview »

August 23, 2019



Installing the basement wet bar cabinets in Glenview »

August 16, 2019



Installing the kitchen cabinets at 511 North Branch in Glenview »

August 8, 2019



Rubber flooring has been installed in the exercise room at our spec house in Glenview »

August 5, 2019

 



The trim and doors have been delivered and finish carpentry will start in Glenview »

July 29, 2019



We have started to install the hardwood flooring at our spec house in Glenview »

July 22, 2019



The backyard planting is done at our spec house in Glenview »

July 21, 2019



The front yard planting has been done at 511 North Branch in Glenview »

July 20, 2019



The tile work has begun in the master bathroom at our spec house in Glenview »

July 16, 2019



The stairs have been installed at our custom home in Glenview »

July 8, 2019



We are using an luxury vinyl plank (LVT) in the basement over radiant heated floors in Glenview »

July 1, 2019



We have laid the asphalt on our driveway at our spec house »

June 28, 2019



There is a front side walk to the house and more trees at 511 North Branch »

June 22, 2019



The front stoop is done and we will work on the sidewalk next at our new construction in Glenview »

June 15, 2019



The driveway is being prepped for asphalt at North Branch in Glenview »

June 13, 2019



The landscaping and paver work has start on our new construction in Glenview »

June 10, 2019



We have added a pergola over the garage at 511 North Branch in Glenview »

May 23, 2019



The drywall is done and we are getting ready to prime at our spec house in Glenview »

May 22, 2019



The insulation should be completed in the next few days and next will be drywall at our new construction in Glenview. »

May 2, 2019



The bead board is in the ceilings in the front porch and in the four season room at 511 North Branch in Glenview »

May 1, 2019

We will be staining these ceilings to match the front door.



We have started the siding and column work at our spec house in Glenview »

April 26, 2019



Installed brick in the window wells and limestone caps on top in Glenview »

April 21, 2019



The four season room has been framed and is ready to be finished at our custom home in Glenview »

April 9, 2019

9



The stoops, generator pad, air conditioner pad and have been poured at our spec house in Glenview »

April 5, 2019



The basement is framed at our new construction on North Branch in Glenview »

March 28, 2019



We used GAF Woodland roofing shingles on the spec house on North Branch in Glenview »

March 22, 2019



The basement slab has been poured in Glenview »

March 20, 2019



The Valder’s Stone has been installed at our new construction in Glenview »

March 16, 2019



The rough HVAC, electrical and plumbing work has started at our spec house at 511 North Branch in Glenview »

March 12, 2019



The Pella windows are being installed at our spec house in Glenview »

February 12, 2019



The roofing felt paper has been installed at our spec house on North Branch in Glenview »

February 9, 2019



The roof sheathing is done and we are ready for felt paper on our spec home in Glenview »

February 8, 2019



The roof framing at 511 North Branch in Glenview has almost been completed »

February 4, 2019



We are framing the roof on our spec house on North Branch in Glenview »

February 1, 2019



The 2nd floor walls are going up at our spec home in Glenview »

January 25, 2019



The sub floor is being installed on the 2nd floor of our spec house at 511 N. Branch in Glenview. »

January 24, 2019



The first floor walls are up we are ready to move to the second floor on North Branch in Glenview. »

January 21, 2019



The first floor decking and walls are going up on our new construction on Branch in Glenview »

January 15, 2019



Running the storm sewer line for our new spec house in Glenview »

January 3, 2019



Running the new water service to the spec house on North Branch in Glenview »

December 28, 2018



The steel has been installed at 511 North Branch in Glenview »

December 14, 2018



We used the Graywall product at our new spec house on Branch in Glenview »

December 10, 2018

The Graywall product is a rubber membrane that is sprayed on the foundation walls as a foundation waterproofing by Westside Rub-R-Wall Inc.



Removing the forms on the foundation walls at North Branch in Glenview »

December 7, 2018



Pouring the Foundation walls at our spec house in Glenview »

December 5, 2018



Setting up the forms for the foundation walls at North Branch in Glenview »

December 4, 2018



We are pouring the concrete for the footings at the spec house in Glenview »

November 21, 2018



We are framing the footings at Branch in Glenview »

November 20, 2018



Excavation continues at the new construction in Glenview »

November 16, 2018



Excavation has started on our spec house on Branch in Glenview »

November 14, 2018



Removing the old foundation on our spec house at 511 N. Branch in Glenview »

November 9, 2018



Demolition has begun for our spec house in Glenview »

November 8, 2018



Construction fencing is up and demolition will begin soon at our spec house in Glenview »

October 19, 2018



We are cleaning the brush around the house on Branch in Glenview. »

October 18, 2018

We have cut the trees and removed the bushes around the house before we start demolition.



New Spec Home at 511 N. Branch in Glenview coming Soon! »

February 25, 2018

We are in the process of purchasing this 2/3’s of an acre lot in Golf Acres.  We will share elevations and plans shortly.











back



News Reviews FAQ Site Map Login