February 22, 2018

The Spec Home has been sold and the new owners have moved in.



Front Elevation link

Stairs link

Stairs link

Family Room with Stairs link

Family Room link

Kitchen Island link

Kitchen link

Kitchen link

Butler Pantry link

Master Bathroom link

Master Bathroom link

Master Bathroom Tub link

Dining Room link

Living Room link

Bathroom link

Laundry Room link

Basement Wet Bar link

Basement Family Room with Fireplace link

Basement Family Room link

Basement Office, Bedroom link

Basement Bathroom link

Back Elevation link


Our Spec House at 937 Echo Lane in Glenview is under Contract! »

December 30, 2017

We are closing at the end of January.



The spec home has been completed in Glenview and is back listed on the market! »

November 28, 2017



The granite and quartz has been installed in the bathrooms at Echo in Glenview »

October 13, 2017



We have installed the Closet Systems at our New Construction at Echo in Glenview »

October 11, 2017



The Kitchen Cabinets have been installed at our Spec House In Glenview »

October 6, 2017



We are installing the kitchen cabinets in our spec house in Glenview »

September 29, 2017



The exterior is done at our new custom home in Glenview! »

September 19, 2017

We have completed the siding and paver work.  We are starting to landscape now.



The hardwood floors have been stained at 937 Echo Lane. »

September 14, 2017



The front door has been installed at our spec house at 937 Echo Lane in Glenview! »

September 6, 2017

Now that the front door and the exterior light fixtures have been installed, we can finish wrapping the columns and complete the siding in the front entry way.



We have started the paver work at our new construction in Glenview! »

September 5, 2017

The driveway is in and we have started the paver work on the front porch and the driveway border.



We have started the finish work at our spec house in Glenview. »

August 29, 2017

We are installing the doors, casing, base and crown moldings.



Hardwood floors have been installed at our spec home in Glenview! »

August 26, 2017

We have installed all the hardwood flooring and we are ready to start the finish work (installing doors, casing and baseboards)



The tile is being installed in the bathrooms, laundry room and mud room in Glenview! »

August 25, 2017



We are installing the hardwood flooring at 937 Echo in Glenview! »

August 24, 2017

We are installing 4″ red oak at our spec home in Glenview.



The deck is being framed at our new construction in Glenview! »

August 18, 2017



We are prepping the garage slab and stoop to pour concrete at 937 Echo Lane Glenview! »

August 10, 2017



We are completing the water and storm work at our spec house in Glenview! »

July 27, 2017



We have started to drywall at our spec home at 937 Echo Lane in Glenview! »

July 15, 2017



The insulation is done and we are ready to drywall our spec house at 937 Echo Lane in Glenview! »

July 7, 2017



We are ready to insulation the walls at our spec house in Glenview! »

July 6, 2017

We have passed all the rough inspections and can now start insulating the house.



The HVAC, Plumbing and Electrical work is done in Glenview! »

July 5, 2017

We have completed all the rough work and are now ready for inspection.



We have started to install the siding at 937 Echo Lane in Glenview! »

June 27, 2017

We are using white trim with the Deep Ocean color Hardie board siding to complement our stone color.

 

 



The stone work has is done and we have installed the rigid insulation in Glenview »

June 22, 2017

Now that the rigid insulation has been installed we can start installing the Hardie board siding.



The roof is done at our new construction on Echo Lane in Glenview. »

June 17, 2017



Rough Framing has been completed at our Spec House »

June 5, 2017

With the rough framing done, we can now have the HVAC, plumbing and electrical work start.

 



Installing the windows at our Spec House at 937 Echo Lane in Glenview. »

June 1, 2017



The roof is being framed at 937 Echo Lane in Glenview. »

May 28, 2017



The stone work has started on our Spec Home on Echo in Glenview »

May 25, 2017

We have started the stone work on our Spec Home at 937 Echo Lane in Glenview.



The second floor has been framed at the Spec house in Glenview! »

May 18, 2017



The first floor walls have been framed at the New Construction in Glenview. »

May 17, 2017

We have finished framing the first floor of our spec home at 937 Echo Lane in Glenview.



The lumber has been delivered and we have started framing our spec home in Glenview! »

May 10, 2017



The basement slab has been poured, framing is next at 937 Echo Lane. »

May 6, 2017

The basement slab has been poured.  They have put control joints uniformly across the basement floor and then they do the final smoothing concrete smoothing by hand.



Ready to pour Basement Slab in Glenview »

May 5, 2017

We have compacted and leveled gravel at the bottom of the basement.  We have installed a vapor barrier between the gravel and the concrete and then we have put down wire mesh.

 



The steel has been installed at Echo and we are ready to work on the basement slab. »

May 4, 2017



Spraying the foundation with Rub-R-Wall at our Spec Home »

April 24, 2017

We have sprayed the walls with Rub-R-Wall, which has a warranty not to leak for the life of the foundation.  After the Rub-R-Wall product has dried, we installed insulation on the foundation walls.



The forms have been removed at our New Construction at 937 Echo Lane Glenview »

April 20, 2017

We have removed the forms and while we let the concrete cure, we will install the steel beams.



The Foundation walls are being poured at 937 Echo Lane in Glenview »

April 18, 2017

The foundation walls are being poured at our new construction spec home in Glenview.



We have begun to frame the foundation walls at 937 Echo Lane in Glenview! »

April 13, 2017



The concrete has been poured for the footings at our New Construction in Glenview! »

April 11, 2017



The footing framing is done and ready for inspection at 937 Echo Lane in Glenview! »

April 8, 2017

Footings are an important part of foundation construction. They are made of concrete with rebar reinforcement that has been poured into an excavated trench. The purpose of footings is to support the foundation and prevent settling.



Excavation has started at our spec home on Echo Lane in Glenview »

April 6, 2017

We have started excavation of our new construction spec home at 937 Echo Lane in Glenview.



Demolition has begun in Glenview! »

March 29, 2017

We have demolished the existing home and will begin excavation for our new spec home at 937 Echo Lane in Glenview.



We are just about to start demolition on a spec home at 937 Echo Lane in Glenview »

March 16, 2017

We have the construction fence up and the permits are ready.  Once the water is shut off we can start demolition  next week.



These are the floor plans for the spec home at 937 Echo Lane in Glenview »

March 13, 2017



These are the color renderings of the spec house we are building in Glenview. »

March 10, 2017



Coming Soon – New Construction in New Trier Township Glenview! »

October 30, 2016

We will be starting construction on a home in the New Trier school district. It is not too late to make some changes during construction.  More information coming in the next few weeks.