Skip to main content
847.410.0620

Commercial & Residential General Contractor

Park Place, Evanston, IL


Custom HomeCompleted Residential Projects


Renovation, Addition & Restoration


email a friend Email a Friend»

Addition and Complete Renovation – Residential Construction Project on Park Place, Evanston, IL »

May 9, 2023

Restoration from the fire.



Front_Elevation link

Front House Full link

Front Door link

Front Door Closeup link

Front Elevation Mudroom link

Front Dormer link

Mud Room link

Mud Room Long View link

Mud Room Bench link

Living Room View link

Living Room Stair View link

Living Room View link

Stairs link

Stair Landing link

Stair Landing Closeup link

Floating Stairs link

Floating Stairs Full View link

Stairs Closeup link

Family_room link

Family Room Fireplace link

Kitchen Island Sink link

Kitchen Island link

Kitchen View link

Kitchen Island link

Kitchen View From Family Room link

Kitchen Oven Wall link

Dining Room link

Dining Room Side View link

Dining Room Kitchen link

Powder Room link

Powder Room Mirror link

2nd Floor Bonus Room link

2nd Floor Bonus Room link

2nd Floor Bonus Room link

Bonus Room Ceiling link

Bonus Room Lighted Ceiling link

Master Bedroom link

Master Bedroom link

Master Bathroom link

Master Bathroom link

Bedroom 2 link

Bedroom 2 link

Bedroom 3 link

2nd Floor Bathroom link

Basement Rec Room link

Basement Bedroom 4 link

Hallway to Laundry link

Laundry Room link

Basement Bathroom link


Our Wine Cellar is ready for Christmas Day at Woodley in Winnetka »

December 23, 2022



Painted and installed wine racks in our wine cellar in Winnetka »

December 21, 2022



Installed the wine cabinet at Woodley in Winnetka »

December 20, 2022



Installed ledger stone on the wine rack wall in Winnetka »

December 12, 2022



Removed the drywall to expose the studs in our soon to be Wine Cellar »

December 5, 2022



Converting this room into a Wine Cellar in Winnetka »

October 28, 2022



Home Addition / Residential Custom House Construction Project • N. Francisco Ave., Chicago, IL »

October 15, 2022

Home Addition & Renovation Project in Chicago



Custom Home in Chicago Front Elelvation link

Front Exterior link

Front Exterior link

Front Door Open link

Front Door Open link

Front Door link

Garage Deck with ramp link

Back Yard link

Patio Deck link

Patio door link

Patio Door link

Front Door link

Entrance link

Kitchen link

Exterior Deck link

Dining room link

Dining Room link

Dining Room and Outdoor Deck link

Office link

1st Floor Master Bathroom link

1st Floor Master Bathroom link

Staircase link

Second Floor Hallway link

Staircase link

2nd Floor Bathroom link

2nd Floor Bathroom link

2nd Floor Bathroom link

2nd floor bathroom link

Bedroom link

Stairs link

Staircase link

1st Floor Stair Case link

Staircase link

Laundry Room link

Laundry room02 link

Master Bedroom link

Master Bedroom link

Master Bedroom link

Master Bedroom link

Master Bathroom link


The doors and trim are being sprayed at our remodel in Lincolnwood »

August 2, 2022



The hardwood floors were bleached to remove the red and then stained to create a white wash look at Longmeadow »

July 23, 2022



We are sanding the hardwood floors to get ready to bleach and white wash them at Longmeadow in Lincolnwood »

July 15, 2022



Installing kitchen cabinets at our Lincolnwood project »

June 29, 2022



Installed modern casing, baseboards and doors at our interior remodel on Longmeadow in Lincolnwood »

June 28, 2022



Installing 3″ red oak hardwood flooring which will be white washed in Lincolnwood »

June 14, 2022



New Pella windows installed at our remodel on Longmeadow »

June 2, 2022



Closed cell insulation was applied on our remodel on Longmeadow »

May 9, 2022



Plumbing work has been done at our remodel on Longmeadow in Lincolnwood »

April 29, 2022



Rough Electrical work has started at our remodel on Longmeadow »

April 6, 2022



The rough HVAC work is being done in Lincolnwood »

April 4, 2022



We have finished the underground plumbing work for the Longmeadow rennovations »

March 30, 2022



The first floor is being framed at Longmeadow in Lincolnwood »

March 28, 2022

 



Framing the walls at our remodel at Longmeadow in Lincolnwood »

March 25, 2022



Demolition has begun at our interior remodel on Longmeadow in Lincolnwood »

March 18, 2022



New Project starting in Lincolnwood »

March 17, 2022



Building out the 3rd floor deck in Lincoln Park »

September 28, 2021



Fire Sprinkler system has been hydro tested at Wolfram in Chicago »

September 21, 2021



Rough electrical completed at Lincoln Park »

September 18, 2021



Rough HVAC is done at Wolfram in Chicago »

September 16, 2021



Rough plumbing finished at our custom home in Lincoln Park Chicago »

September 16, 2021



Building the 2nd floor deck outside master bedroom at Wolfram »

August 14, 2021



Building the interior walls in the 3rd floor at our custom home in Lincoln Park »

August 5, 2021



Installing the Glulam trusses for the barreled roof in Lincoln Park »

July 29, 2021



Connecting new sanitary from street to house at Wolfram in Chicago »

May 20, 2021



Installing the Pella windows at Wolfram in Lincoln Park »

May 19, 2021



Building the interior walls at our custom home in Lincoln Park »

May 14, 2021



Installing structural brick on the 2nd floor at our custom home in Lincoln Park »

April 28, 2021



Installing steel in the 2nd floor at Wolfram in Chicago »

April 22, 2021



Building 2nd floor walls at custom home in Lincoln Park »

April 20, 2021



Installing the Atlas structural brick for 1st floor wall at Wolfram in Chicago »

April 10, 2021



Building 1st floor walls and installing steel at our custom home in Chicago »

April 9, 2021



Installing the 1st floor trusses at our Lincoln Park custom home »

April 2, 2021



Poured foundation slab at Wolfram in Chicago »

March 29, 2021



Installing radiant heat in the basement at our custom house in Lincoln Park »

March 16, 2021



Foundation has been covered with gravel at Wolfram »

March 11, 2021



Garage slab is backfilled at Wolfram in Chicago »

March 9, 2021



Underground plumbing is completed at our custom house in Lincoln Park »

March 9, 2021



We are about to start a new project in Evanston »

February 14, 2021



Removing the steel shoring from our custom home in Lincoln Park »

February 4, 2021



Demolition has begun at Paulina in Chicago »

January 27, 2021



Foundation forms are removed and damp proofing is done at our custom home on Wolfram »

January 26, 2021



Framing the foundation walls at Wolfram in Lincoln Park »

January 20, 2021



Framing and pouring the footings in Lincoln Park »

January 18, 2021



Cross bracing needs to be installed as we excavate at Wolfram in Lincoln Park »

January 15, 2021



Complete interior remodel starting soon at 5214 N. Paulina in Chicago »

December 29, 2020



The old house has been demolished at our new construction on Wolfram »

December 22, 2020



Testing the soil before demolition at our Lincoln Park project »

November 30, 2020



Demolition to begin soon at Wolfram in Lincoln Park Chicago »

September 29, 2020



Deconstruction has begun on Francisco in Chicago »

September 22, 2020

 
Recyclean has started to take out the windows to be recycled/reused and the hardwood flooring.



Addition on Francisco in Chicago starting soon »

September 17, 2020



Custom Home in Glenview: 511 N Branch Rd., Glenview, IL 60025 »

January 4, 2020

New Construction, 4 Bedroom, 4.1 Bath.



Front Elevation link

House Front link

Garage Door link

House Front Door Entrance link

Front Door Entrance link

Foyer Stairs View link

Foyer View link

Foyer Hallway View link

Foyer Front Door view link

Kitchen view from Mudroom link

Kitchen Breakfast Room View link

Kitchen view from Great Room link

Kitchen view from Breakfast Area link

Kitchen east wall link

Kitchen Dining Room view link

Kitchen view from four season room link

Kitchen Breakfast Area link

Kitchen Great Room view link

Butlers Pantry link

Four Season Room link

Foyer Office View link

Staircase link

Powder Room link

Office link

Great Room wide view link

Great Room side view link

Great Room Front View link

Great Room Fireplace View link

Great Room link

Great Room Kitchen view link

Staircase Dining Room link

Dining Room view from the Kitchen link

Dining Room link

Dining west wall link

Master Bedroom First Floor link

Master Bedroom link

MasterBed link

EnSuite Bedroom Second Floor Sitting Area link

1_EnSuite Bedroom Second Floor Sitting Area link

Master Bathroom link

Master Bathroom Vanity link

Master Bath link

Master Bathroom Tub link

Master Bathroom Tub east wall link

Master Bathroom wide view link

Master Bathroom Shower link

Master Bathroom Shower closeup link

Foyer Stairs view link

Second Floor Stairs link

Second Floor Loft link

Second Floor Foyer link

Second Floor Foyer view link

Laundry Room Second Floor link

EnSuite Entrance Second Floor link

Third Bedroom Second Floor link

1_Third Bedroom Second Floor link

Jack and Jill Bath link

Jack and Jill Double Vanity link

4th Bedroom Second Floor link

1_4th Bedroom Second Floor link

Basement Stairs link

Basement view link

Basement Toy Room link

Basement Great Room link

Basement Great Room Fireplace link

Basement Great Room wide view link

Basement Bar and Pool Table link

Basement Pool Table Area link

Basement Pool Table front view link

Basement Pool Table link

Basement view from Exercise Room link

Basement Wet Bar link

Basement Bar and Wet Bar Area link

Basement Kitchen Bar Wine Cellar link

Basement Bathroom link

South Elevation Entrance link

Backyard Path link

Backyard link

Backyard East Elevation link


Garage Flooring Experts are epoxying the garage floors at our Custom House in Glenview »

December 27, 2019



The closets are being installed at our custom house at 511 North Branch in Glenview »

December 24, 2019



The fireplaces are done at our custom house in Glenview »

December 2, 2019



The kitchen back splash tile is being installed at 511 North Branch in Glenview »

November 6, 2019



Installing the quartz and mantle on the fireplace at 511 North Branch »

October 25, 2019



The light fixtures are being installed at our custom house in Glenview »

October 24, 2019



We are painting our custom home in Glenview »

October 11, 2019



The master bathroom and wet bar cabinetry is being installed at our spec house »

October 11, 2019



The grass is starting to fill in at 511 North Branch in Glenview »

September 30, 2019



The balusters have been installed at our spec house in Glenview »

September 18, 2019

 











back



News Reviews FAQ Site Map Login