Installing the new basement stairs at our addition on Kilbourn in Skokie »

March 4, 2019



The Pella windows are being installed at our spec house in Glenview »

February 12, 2019



The roofing felt paper has been installed at our spec house on North Branch in Glenview »

February 9, 2019



The roof sheathing is done and we are ready for felt paper on our spec home in Glenview »

February 8, 2019



The roof framing at 511 North Branch in Glenview has almost been completed »

February 4, 2019



Installing Kitchen back splash tile at the addition in Skokie »

February 1, 2019



We are framing the roof on our spec house on North Branch in Glenview »

February 1, 2019



New Construction Custom Home on Mango, Morton Grove, IL »

January 26, 2019

On a prime piece of property in Morton Grove, two outdated houses stood side by side, ready to make way for something extraordinary. The project began with a full-scale demolition, carefully dismantling the structures to clear the land for an expansive 10,000-square-foot custom home. The new residence began to take shape, featuring a grand entryway, soaring ceilings, and a glass elevator designed for both luxury and functionality. What once was two aging homes transformed into a stunning estate, seamlessly blending sophistication, craftsmanship, and innovation into a masterpiece built to stand the test of time.



Front Elevations Road View

Front Elevations

Foyer, Stairs Ceiling Lights

Foyer Ceiling, Chandelier

Foyer Window Drapery

Staircases

Foyer, Stairs, Formal Living Room

Foyer, Left Stairs

Elevator, Foyer, Front Door

Front Door view from Glass Elevator

Foyer, Front Doors

Foyer, Stairs, Dining Room, Elevator

Foyer, Stairs, Dining Room

Dining Room, Window Decoration Detail

Dining Room

Dining Room Table

Dining Room Cabinets

Stairs

Formal Living Room Front View

Formal Living Room

Formal Living Room Window Decoration

Kitchen

Kitchen Stove, Backsplash

Kitchen Window View

Dining Area Kitchen

Kitchen, Dining Area

Family Room

Stairs, Foyer View from the second floor

Master Bedroom Suite

Master Bathroom

Bedroom Suite 1

Bedroom Suite 1, Window Decoration

Bathroom Suite 1

Bedroom Suite 2

Bathroom Suite 2, Window Decoration

Bathroom Suite 2

Bedroom Suite 3

Bedroom Suite 3, Light On

Bathroom Suite 3

Bathroom Suite 3, Shower

Basement Staircases

Basement Glass Elevator

Basement Stairs

Basement Room

Basement Kitchen

Basement Kitchen Side View

Basement Kitchen Island

Basement Kitchen Backsplash

Garage, Backyard

Garage Entrance


The 2nd floor walls are going up at our spec home in Glenview »

January 25, 2019



The sub floor is being installed on the 2nd floor of our spec house at 511 N. Branch in Glenview. »

January 24, 2019



The first floor walls are up we are ready to move to the second floor on North Branch in Glenview. »

January 21, 2019



The first floor decking and walls are going up on our new construction on Branch in Glenview »

January 15, 2019



Running the storm sewer line for our new spec house in Glenview »

January 3, 2019



Running the new water service to the spec house on North Branch in Glenview »

December 28, 2018



Starting the Build Out of Hollywood Trendz Hair & Spa in Addison »

December 18, 2018



Starting the Build out of Four Seasons Steak & Grill in Addison »

December 18, 2018



Starting the Build out of New York Chaat in Addison »

December 18, 2018



Starting the Build out of Alara Designer’s Boutique in Addison »

December 18, 2018



The steel has been installed at 511 North Branch in Glenview »

December 14, 2018



We used the Graywall product at our new spec house on Branch in Glenview »

December 10, 2018

The Graywall product is a rubber membrane that is sprayed on the foundation walls as a foundation waterproofing by Westside Rub-R-Wall Inc.



Removing the forms on the foundation walls at North Branch in Glenview »

December 7, 2018



Pouring the Foundation walls at our spec house in Glenview »

December 5, 2018



Setting up the forms for the foundation walls at North Branch in Glenview »

December 4, 2018



We are pouring the concrete for the footings at the spec house in Glenview »

November 21, 2018



We are framing the footings at Branch in Glenview »

November 20, 2018



Excavation continues at the new construction in Glenview »

November 16, 2018



Excavation has started on our spec house on Branch in Glenview »

November 14, 2018



Removing the old foundation on our spec house at 511 N. Branch in Glenview »

November 9, 2018



The cabinets are being installed in the kitchen at Kilbourn in Skokie »

November 9, 2018



Demolition has begun for our spec house in Glenview »

November 8, 2018



Construction fencing is up and demolition will begin soon at our spec house in Glenview »

October 19, 2018



Besides the drywall and insulation we have to remove everything that got water damage after the fire in Chicago »

October 18, 2018



We are cleaning the brush around the house on Branch in Glenview. »

October 18, 2018

We have cut the trees and removed the bushes around the house before we start demolition.



The front door and roof gable has been completed at Kilbourn in Skokie »

October 18, 2018



Starting to gut the 2nd floor of the house to remove all drywall and insulation from the fire damage in Chicago »

October 15, 2018



We will be starting repairs on this fire damaged house in West Roger’s Park Chicago »

October 13, 2018



Closing up the old entrance and making a new entrance to the service corridor at Shalimar Plaza Addison »

October 11, 2018



Hardwood floors are being installed at our addition in Skokie »

October 11, 2018



The tile work has begun at our addition in Skokie »

October 5, 2018



The sidewalk in front of Shalimar Plaza is being framed and prepped so that we can pour concrete in Addison »

September 28, 2018



The rough plumbing is done for the Hollywood Trendz Hair Salon build out in Addison »

September 25, 2018



Underground plumbing work for the bathrooms and sanitary at our commercial build outs in Addison »

September 24, 2018



Underground plumbing work has started for the kitchen in Four Seasons Steak & Grill in Addison »

September 19, 2018

We are installing the grease trap in the kitchen



We are excavating for the parking lot in front of Shalimar Plaza »

September 12, 2018



We have started framing Alara Designer’s Boutique at Shalimar Plaza in Addison »

September 3, 2018



The curbs are being poured at Shalimar Plaza in Addison »

August 31, 2018



Drywall has been hung, taped and primed at the addition on Kilbourn in Skokie »

August 27, 2018



We have started framing Hollywood Trendz salon and the service corridor in Addison »

August 23, 2018



The curbs are being framed and prepared for concrete at Shalimar Plaza in Addison »

August 23, 2018



The underground plumbing has been inspected and we have poured the concrete for the salon build out »

August 22, 2018



Masonry work and landscaping done at our addition in Skokie »

August 21, 2018



The parking lot elevations have been marked and we are getting ready to excavate in Addison »

August 17, 2018



Community Animal Rescue Efforts has been completed and is ready for Adoptions in Skokie »

August 16, 2018


The Address is 4927 Main Street in Skokie.



Running the sanitary lines from inside the building to the sanitary manholes at our Commerical project in Addison »

August 10, 2018



Installing the sanitary manholes at our commercial store build outs in Addison »

August 7, 2018



The sanitary manholes are being delivered for our commercial job in Addison »

August 6, 2018



The exterior signs and lights are up on the Animal Rescue on Main St. in Skokie »

August 4, 2018



New Commercial Salon Build out will be starting soon in Addison »

July 30, 2018

We will be starting the build out of the Hollywood Trendz Hair & Spa at their new location in Shalimar Plaza in Addison.



New roof over front door at the addition on Kilbourn in Skokie »

July 18, 2018

The owners have decided they want an roof overhang over the front door.

 



We are using Closed Cell spray foam insulation at Kilbourn in Skokie »

July 17, 2018



Starting to access the damage and start the restoration process after the fire in Skokie »

June 28, 2018

The fire started in the kitchen and spread.  The first step was to call Simon at Rainbow Restoration in Skokie to have him come in to find out what of the personal belongings could be salvaged.



Alara Designer’s Boutique under ground plumbing has been completed and is being prepped to pour the concrete in Addison »

June 25, 2018



Soon we will be starting repairs on this fire damaged house in Skokie »

June 25, 2018

From the outside you can’t tell that this house has had a fire.



A solar hot water system was installed at the Animal Rescue in Skokie »

June 25, 2018

The solar system should roughly produce 200 gallons of hot water per day or 80,000 gallons per year.  Since animal rescue facilities use so much hot water this will help with saving heating costs.

 

 

 

 

 



The salon underground plumbing is being prepped before pouring the concrete at our commerical buildout in Addison »

June 21, 2018



The front door awning is going up at C.A.R.E. on Main St in Skokie »

June 20, 2018



We are bringing the water lines to our 8 storefronts in Addison »

June 15, 2018

We are bringing the water lines from the City main to each of the store fronts.



The metal roof has been installed on the commercial facade in Des Plaines »

June 15, 2018



We are putting in a utility vault for the water tap at 260-274 W. North Ave in Addison »

June 6, 2018

A utility vault is an underground room providing access to the water line and valves that are connected to the City main line



The underground pvc has been laid for Hollywood Trendz Hair & Spa in Addison »

June 5, 2018

The PVC for the bathroom, pedicure chairs and laundry room are done